国产精品日产欧美久久久,真实的和子乱拍在线观看,亚洲精品无码久久久,国产深夜男女无套内射

400-0302-595
首頁(yè) > Industry hotspots
Case | Shaoxing Converter Station: Starting Annual Maintenance of the "West East Power Transmission
Time:2022-04-13 14:16:16Source:Anlpsorder

Recently, the Shaoxing converter station completed its 6th annual comprehensive maintenance, laying a solid foundation for ensuring power supply during this summer's peak electricity consumption period in Zhejiang and the Hangzhou Asian Games.

Zhejiang is a province with high energy consumption and low resources, and foreign electricity accounts for more than one-third of the highest load in the province. Adding to the key tasks of ensuring electricity supply during the Hangzhou Asian Games and summer peak season, the task of ensuring electricity supply in Zhejiang this summer has become even more challenging. In this annual maintenance, State Grid Zhejiang Ultra High Voltage Company, based on daily operation and maintenance experience and anti accident measures investigation, carried out maintenance on new equipment such as converter transformer lifting seats installed in Shaoxing converter station in recent years. The operation and maintenance personnel of State Grid Zhejiang Ultra High Voltage Company have installed 70 visible light cameras in the DC field and AC filter field, and connected them to the panoramic video fusion system of the converter station to improve the information perception ability of the system. The panoramic video fusion system initially has four functions: self perception and digital expression, equipment status analysis and diagnosis, accident response, and intelligent control, which can help improve the efficiency of operation and inspection.

The Shaoxing converter station is a ± 800 kV Lingshao DC receiving end converter station, which was put into operation in August 2016. The project starts from Lingzhou Converter Station in Yinchuan, Ningxia, passes through 6 provinces (regions), and ends at Shaoxing Converter Station in Zhuji, Zhejiang. The total length of the line is 1720 kilometers. As the main artery of the "West East Power Transmission", the Lingshao DC project has maintained stable operation with a large load of 7200 megawatts for a long time, continuously sending wind and solar power from thousands of miles away from the Ningxia energy base to Zhejiang, with a maximum daily power transmission of 160 million kilowatt hours, making the vision of "coal flowing from the air and electricity coming from afar" a reality.

As one of the first pilot projects for digital converter stations in China, State Grid Zhejiang Electric Power has applied new technologies such as the Internet of Things, artificial intelligence, 3D modeling, and Beidou positioning at the Shaoxing converter station, integrating automated collection of equipment monitoring data to achieve remote intelligent inspection of equipment, centralized monitoring of data, and automatic push of fault handling strategies. The application of new technologies has enhanced the ability of operation and inspection personnel to control equipment, ensuring the long-term safe and stable operation of the converter station.

安貝斯

Based on the concept of the "West East Power Transmission" main artery of Shaoxing converter station, and in combination with the analysis of the informationization status required by the control center, Ambes participated in the construction of the main control room, laying a solid foundation for the informationization construction of the command center, promoting the later development to break through institutional and mechanistic bottlenecks, improving the policy support system for expanding domestic demand, and substantially implementing the expansion of domestic demand. On the LED screen in the main control room, the digital converter station panoramic video fusion system is running. The system can display visible light images of the entire station equipment in a single image, synchronously displaying operating condition information such as infrared temperature measurement data of the converter transformer square, DC field, and converter valve.

Due to the shift in annual inspection time, after the completion of this maintenance work, the project will face the test of long-term operation conditions of "one and a half years" for the first time. Digitization will provide important impetus for the continuous operation of the Lingshao DC project.

Recommend

安貝斯_穎兒

027-86578008

在線咨詢

51精产一二三产区区别| 狠狠色综合7777久夜色撩人| 久久人人爽人人爽人人AV| 老太爷的春桃乳妓h| 囗交姿势图3d效果展示图| 人妻[21P]大胆| 精品一区二区三人妻视频| 色屁屁WWW影院免费观看入口| 精品国产免费一区二区三区| 亚洲毛片| 日本无码色情影片在线看| 久久性爱视频| 午夜不卡久久精品无码免费| 日本的AAA高清片| 中文字幕在线播放| 护士张开腿被奷日出白浆| 国产精品VA在线观看无码| 顶级欧美色妇XXXXX| 亚洲国产精品久久久久秋霞影院| 自己撅起来乖乖挨c烂h| 男人手伸进我内衣揉我胸到爽 | 白少洁第1一40章免费阅读| 日本a级作爱片| 岳故意装睡让我挺进去观看| 人久人久人久污污污精品国产| 一女被五男在别墅调教| 免费观看又色又爽又黄的| 人妻巨大乳hd免费看| sm调教贱屁股眼哭叫求饶h| 国产全是老熟女太爽了| 捏胸吻胸添奶头gif动态图 | 人与牲动交XXXXBBBB| 久久精品亚洲AV三区麻豆| 成年美女黄网站色大片不卡| 高潮又爽又无遮挡又免费| 亚洲乱码日产精品一二三| 亚洲精品午夜久久久伊人| 人禽伦免费交视频播放| 噜噜噜亚洲色成人网站| 久久久久久久人妻无码中文字幕爆| 欧美老熟妇乱大交XXXXX|